Initial Setup
Follow the instruction below in order. Once you have reached the end of this section please proceed to the "Hardware Inspection" section on the next page.
Position the tripod base legs
Confirm that the chain is through each leg
Secure the carabiner lock
Spread the base legs for a balanced foundation

Secure the pole section to the base section
Mount the externals box to the bracket on the pole
Insert four hose clamps through each of the four bracket openings
Elevate the externals box to preferred hight
Secure the four clamps firmly to the base pole
Insert Remote Controller & secure solenoid pusher to RC
Secure the RC to the inside of the box with double sided velcro
Insert USB-C power cable into the bottom side of the RC
Insert
Solenoid pusher goes over RC power button only one way
Attach antennas to top of externals box
Hand tighten the three antennas to the top of the externals box
Insert assorted cables into the correct slots
Insert Power Cable "A" into the externals box
Insert Ethernet Cable "B" into the externals box
Insert USB "C" into the externals box
Insert USB "D" into the externals box
Connect cables from externals box into Atlas station
Insert power cable A into the Atlas and the other end into a power source
Insert cable B into the Atlas and the other end into the externals box
Insert cable C into the Atlas as seen below
Insert cable D into the Atlas as seen below
Remove the four rubber end pieces from the drone feet
These pieces MUST be removed so that once the drone is on the landing pad it can slide freely during pad adjustment.
Remove the rubber pieces and place the drone to the side on standby for the meantime